Product Details
Place of Origin: China
Brand Name: Lock tech
Certification: ISO/IATF/ROHS
Model Number: stamping parts
Payment & Shipping Terms
Minimum Order Quantity: 10000PCS
Price: To be negotiated
Packaging Details: To be negotiated
Delivery Time: 3-6 Weeks
Payment Terms: D/P,T/T
Supply Ability: To be negotiated
Application:
|
Automotive, Electronics, Machinery, Etc.
|
Experience:
|
Over 17 Years
|
Certicifation:
|
ROHS Compliant
|
Drawing:
|
Received 2D/3D , CAD , PFD
|
Lead Time:
|
10-15 Days
|
Keywords:
|
Sheet Metal Press Parts
|
Craft:
|
Stamping
|
Industry:
|
Metal Stamping Parts
|
Standard Or Not:
|
Non Standard, OEM
|
Market:
|
USA, Europe, Middle East Country
|
Application:
|
Automotive, Electronics, Machinery, Etc.
|
Experience:
|
Over 17 Years
|
Certicifation:
|
ROHS Compliant
|
Drawing:
|
Received 2D/3D , CAD , PFD
|
Lead Time:
|
10-15 Days
|
Keywords:
|
Sheet Metal Press Parts
|
Craft:
|
Stamping
|
Industry:
|
Metal Stamping Parts
|
Standard Or Not:
|
Non Standard, OEM
|
Market:
|
USA, Europe, Middle East Country
|
Attribute | Details |
---|---|
Place of Origin | Guangdong, China |
Model Number | Lock Tech |
Brand Name | Other |
Material | Carbon steel, Aluminium, Stainless Steel, Brass |
Surface treatment | Nickel plated, Sandblasted, Zinc plated |
Provide | OEM service |
Drawing format | CAD/DWG ETC |
Tolerance | Customer's Drawing Request |
Size | Customer's Drawing Request |
Process | Stamping, Laser cutting, bending, welding, punching |
Thickness | 0.5~25mm |
Quantity (pieces) | Lead time (days) |
---|---|
1 - 10000 | 10 |
10001 - 50000 | 15 |
50001 - 100000 | 20 |
> 100000 | To be negotiated |
Maximum order quantity | 100pcs |
Sample price | $0.10/piece |
Size and material | Custom size and materials |
Min. order | 10000PCS |
Item | Details |
---|---|
Item | Various stamping products |
Size | Customized or in stock |
Material | Carbon steel, stainless steel, beryllium copper, phosphor copper, etc. |
Finishing | Plating, spraying, electrophoresis, anodizing, painting, powdering, heat disposing, black oxide coating, rust preventive oil, plastic, etc. |
Production time | 5-7 days |
Lead time | 10-15 days |
Packing | Inner plastic bag outer carton box, and advised by customer |
Payment | T/T, L/C, WU, Paypal |
Certification | ISO9001, SGS, ROSH |